Below - Sept. 16th, 2002 - Maggie, Tracy & Ron in front of the office.
fwr 2.jpg (61689 bytes)
Below - June 18th, 2002 - H2O Retention cap in place.
Below - June 12th, 2002 - Excavation trenchwork completed & ready for forms.
Below - June 5th, 2002 - Mike Donahue watches over foundation trench preparation. 
Below - May 30th, 2002 - H2O Retention system.
Below - May 22nd, 2002 - New retainer wall is about 80% complete.
Below - May 15th, 2002 - New culvert installed for driveway from Hwy 99. 
Below - May 8th, 2002 - Tracy, Hilary & Ron take part in Ground Breaking Ceremony. 
Below - Fall 2001, Below...Ron explains the project...MedVideo.gif (97 bytes)
weMVC-744F.jpg (42203 bytes)
Below...View, up-hill, South to North, currently being graded.
weMVC-741F.jpg (42391 bytes)
Below...View Down-hill, North to South... MedVideo.gif (97 bytes)
weMVC-755F.jpg (60785 bytes)
Below...Ron operates the Compactor once the desired grade has been reached. MedVideo.gif (97 bytes)
weMVC-745F.jpg (47126 bytes)
Below...Rick Cram, Project Manager, runs the big Front-End Loader. MedVideo.gif (97 bytes)
weMVC-752F.jpg (57240 bytes)
Below..."Fast Freddy" operates the Big-Cat Dozer. MedVideo.gif (97 bytes)
weMVC-754F.jpg (64454 bytes)
Below..."Jumpin' Jody" runs the Excavator, loading the trucks. MedVideo.gif (97 bytes)
weMVC-753F.jpg (57707 bytes)
Below..."Jumpin' Jody" & Rick Cram loading trucks. MedVideo.gif (97 bytes)
weMVC-751F.jpg (53981 bytes)